National security

Elastic inference for sensor-saturated missions.

Pipelet turns GPU capacity across permitted providers into one elastic pool for bursty, high-volume sensor processing.

Diagram of a sensor processing chain. Upstream: sensor feeds including electro-optical and infrared, full-motion video, and radar track data. Centre: Pipelet as the elastic inference layer, which scales GPU capacity to the feed rate, runs vision and video models, and re-places work when a provider degrades, labelled 'not a sensor, not an effector'. Downstream: exploitation and command-and-control, producing detections and tracks, decision support, and operator workflows.
Pipelet is an enabling compute layer, not a sensor or an effector.
Capability area

Tracking & Targeting; Enabling Technologies.

Pipelet supports Tracking & Targeting with elastic AI inference and Enabling Technologies as compute for modeling and simulation.

Mission need Pipelet contribution
High-volume EO/IR and full-motion video processing Frame-sequence inference for continuous sensor exploitation.
Surge capacity during elevated activity Autoscaling across providers as processing demand changes.
Resilience against provider or region loss Automated re-placement onto healthy capacity.
Avoiding vendor lock-in on compute Portable workloads across heterogeneous accelerators and providers.
Cost control at architecture scale Scheduling against live price and availability.
Technical maturity

Self-assessed readiness.

Readiness is scoped to the target environment.

COMMERCIAL ENVIRONMENT

TRL 8

The full stack runs ~10,000 videos per day, autoscales roughly 3×, sustains about 80% utilization, and fails over across providers.

DEFENSE ENVIRONMENT

TRL 5

Proven commercially, but not yet demonstrated with government data in an accredited environment.

Transition path

A realistic first increment.

Start with a bounded prototype using representative unclassified data.

PHASE 01

Technical exchange

Feed rates, model class, latency budget, data-residency constraints.

PHASE 02

Benchmark

Compare a representative workload with the current baseline.

PHASE 03

Constrained deployment

Deploy into a designated environment while accreditation proceeds.

PHASE 04

Operational increment

Sustained processing role with surge and failover exercised under load.

Available for Other Transaction Agreements, prototypes, SBIR/STTR, and subcontracting.

Open to a technical exchange.

Send the feed rate, model class, latency budget, and data constraints.